Get complete information related to latest Wooden Crates Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Wooden Crates Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Wooden Crates Tenders.
Tender For auction sale of depot miscellaneous scrap - (b) pl. no.98413200, w-6/jun-26/01: scrap woodencrates /offcuts /sleeper pilers etc, mostly firewood as available in the lot. (qty. 65 mt)
Tender For auction sale of metallic, non-metallic - disposal of unserviceable/obsolete items as per annexure-i (woodencrates, polythene cover black, empty al.ph3 bottles & miscellaneous etc.)
Tender For supply of upgradation fabrication and refurbishment of conference room with all associated accessories-, slate size: 18 x 18 inches, thickness of slate: 03 mm, slate base: polyfiber, colour: naturally slated teak wood finish, ingredients - recycled rubber crumb and polymer - voramer rr-1009, characteristic-shock absorbent and anti skid, . specific feature: water repellant and scratch resistant, provisioning of over head partition boards for conference room, , aluminum frame paneling for over head structure. area: -288 sq.ft, over head partition boards-288 sq.ft, cooler warm white energized shades with a kelvin range of 2200 k to 6500 k. quantity: 04 nos, moisture absorbent anti odour fragranced overlay coating, temperature control unit with moisture controller and all associated accessories, specifications and performance parameters:, capacity: 2 ton, type of indoor: cassette, voltage/frequency / phase: 380-415v/50 hz/3 phase, compressor type: dual rotary, refrigerant: r 32, -nominal capacity (tr) as per bee: 3 tr, -noise level indoor (high/medium/ low) in db(a): 57.5/53/50.2, - moisture removal (litres/hour): 5.2, cooling capacity (btu/hr): 35997, - ambient temp (cooling)°c: 52°c, 840 x 245 x 840 idu dimension (wxhxd) mm, idu grill dimension (wxhxd) mm: 1020 x 50 x 1020 user interface - lcd remote with night glow function
Tender For bid to ras tender for supply of items for upgradation offices - modular work station table with key board drawer including labour charge , iron frame work incl labour charge , wall paneling including wooden framing hardware and labour charge , wooden flouring including wooden framing hardware and labour charge , ply wood hdmr 19mm 8ft x 4 ft
Tender For bid to ras supply of king size bed side table size 72x78 , king size mattress 6 size 72x78 , bed sheet with pillow , wooden cupboard three door , dressing table , sofa chair as per design , center table , room carpet rug , wall paper with , curtain full size , wall paneling with laminate mica and louvers , tv wall paneling , corner three-piece sofa with velvet cloth cover , night lamp for hall and bed room , painting frame for hall and bedroom area , center table teak wood top glass 36x21 inch , window framing with printed roller blinds , mud art painting for bed room , painting frame for hall , voltas split ac 02 ton with installation , fridge 165 ltr , tv 42 inch vu with electric fitting and installation
Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - woodencrates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - woodencrates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - woodencrates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]